Giving Specific Examples
Mia points out two sections where figures and sources were missing, and explains how that affected the review. She invites Leo to look at the examples together rather than relying on general criticism.
Dialogue10

I’ve been reviewing the report, and I noticed two places where some details may have fallen through the cracks. Would you mind looking at them with me?
Sure. I thought I’d covered everything, but I’m happy to take a closer look. Which sections are you referring to?
The sales forecast on page four doesn’t include the figures behind the estimate, and the customer trends section doesn’t cite its sources. Could we start with those?
Oh, I see. I put the forecast figures in my working notes, but I guess they didn’t make it into the final version. I’ll check the trends section, too.
Here, this estimate says sales could rise by twelve percent, but without the underlying figures, the reviewer couldn’t tell how we arrived at it.
That makes sense. I can see how it might look like we pulled the number out of thin air, even though there was a calculation behind it.
Exactly. And in the trends section, the claims about repeat purchases and customer preferences don’t point to a source, so the reviewer had to flag both for follow-up.
I see why that slowed things down. I used the research summary, but I didn’t add the original sources. Let me pull it up and see what I can find.
Thanks. I’m not questioning the analysis itself; I just want the evidence to be easy to trace. If we add the figures and source links, the review should go more smoothly.
That’s fair. I’ll update both sections and send you the revised version. If I can’t track down a source, I’ll flag it instead of leaving the claim as it is.
Vocabulary6
- fallen through the cracks
This means something was accidentally missed or left out. Here, Mia uses it gently to point out missing details.
- take a closer look
This means to examine something more carefully. You can use it to invite someone to review a document or problem with you.
- underlying figures
These are the numbers or data that support an estimate or conclusion. Use this phrase when explaining what evidence a calculation is based on.
- pulled the number out of thin air
This means the number may seem made up without evidence. It is an informal way to describe how an unsupported figure could appear to a reviewer.
- track down
This means to find something after searching for it. Here, Leo uses it about locating the original sources.
- go more smoothly
This means to happen with fewer problems or delays. Use it to describe how a change or preparation could make a process easier.
Key Sentences7
- 1
Would you mind looking at them with me?
This is a polite way to ask someone to review specific examples together. You can adapt it by replacing “them” with the document or issue you want to discuss.
- 2
The sales forecast on page four doesn’t include the figures behind the estimate, and the customer trends section doesn’t cite its sources.
This sentence gives two specific examples instead of making a general criticism. Use the pattern “doesn’t include…” or “doesn’t cite…” to describe gaps clearly.
- 3
Here, this estimate says sales could rise by twelve percent, but without the underlying figures, the reviewer couldn’t tell how we arrived at it.
This explains both the missing evidence and its effect on the review. You can reuse the structure “without X, someone couldn’t tell how…” to show why a detail matters.
- 4
I can see how it might look like we pulled the number out of thin air, even though there was a calculation behind it.
This acknowledges how the work could appear to others while clarifying the intent. The phrase “I can see how it might look like…” is useful for discussing perceptions tactfully.
- 5
I’m not questioning the analysis itself; I just want the evidence to be easy to trace.
This separates the quality of the analysis from a concern about its documentation. Use “I’m not questioning X; I just want Y” to make feedback feel balanced.
- 6
If we add the figures and source links, the review should go more smoothly.
This uses a conditional to connect a practical action with a likely benefit. You can adapt it to suggest how a change may improve a process.
- 7
If I can’t track down a source, I’ll flag it instead of leaving the claim as it is.
This sentence gives a clear plan for handling information that cannot be verified. The structure “If I can’t…, I’ll…” is useful for agreeing on a backup action.