Revising the Contract for the Future

修訂合同以防範未來風險

Grace and Mia revise the supplier agreement to make delivery milestones, inspection windows, defect reporting, and remedies more precise. They share the proposed changes with David and confirm how the updated terms will prevent similar disputes.

Grace 和 Mia 修訂供應商協議,明確交付節點、驗收期限、瑕疵報告要求和補救措施。他們將擬議的修改發給 David,並確認新版條款將如何避免類似糾紛。

對話12

Revising the Contract for the Future
Grace
Grace

Thanks for making time, David. After settling the current claim, we reviewed the agreement and found several provisions that leave too much room for different interpretations.

謝謝你抽時間,David。解決當前索賠後,我們重新審閱了協議,發現有幾條規定留下了太多不同解釋的空間。

David
David

That’s fair. The last dispute showed how quickly an unclear deadline can turn into an argument. What changes are you proposing for future orders?

這話有道理。上次的糾紛說明,期限不明確很容易引發爭議。你們提議對今後的訂單作哪些修改?

Mia
Mia

First, we’d like delivery milestones tied to specific calendar dates, with written notice required if a shipment is at risk. The current phrase, “approximately on schedule,” isn’t sufficiently precise.

首先,我們希望將交付節點明確對應到具體日期,並要求一旦貨運可能延誤,就必須書面通知。現有的“基本按計劃交付”這一表述不夠精確。

David
David

I can agree to fixed dates, provided the schedule accounts for carrier disruptions outside our control. We could require notice within one business day of learning about a likely delay.

只要時間安排能考慮到承運方造成的、我們無法控制的中斷,我可以接受固定日期。我們可以要求在得知可能發生延誤後的一個工作日內發出通知。

Grace
Grace

That works, as long as notice doesn’t automatically excuse late performance. Any extension should be limited to the actual delay caused by the disruption and documented in writing.

可以,但通知本身不能自動免除逾期交付的責任。任何延期都應僅限於該中斷實際造成的延誤,並以書面形式記錄。

Mia
Mia

For inspections, we propose ten business days after receipt to identify visible defects, and a separate period for latent defects that reasonably couldn’t be found during that initial review.

關於檢驗,我們建議自收貨之日起有十個工作日用於發現可見缺陷;對於在初檢時合理情況下無法發現的隱蔽缺陷,則另設報告期限。

David
David

Ten days is workable. For latent defects, though, we need a clear outer limit. Would six months from delivery be reasonable, assuming the components are used and stored properly?

十天可以接受。不過,隱蔽缺陷也需要明確的最長期限。如果零部件使用和儲存得當,自交付之日起六個月的期限是否合理?

Grace
Grace

Yes, with one qualification: the clock should start when the defect is discovered, but claims must be submitted within six months of delivery. We’ll also specify what evidence a report must include.

可以,但有一點需要說明:索賠期限應從發現缺陷時起算,但必須在交付後六個月內提交。我們也會明確報告必須包含哪些證據。

Mia
Mia

The remedies should be equally specific: repair or replacement, expedited shipping where appropriate, or a proportionate price reduction if those options don’t adequately address the loss.

補救措施也應同樣明確:維修或更換;適當情況下加急運輸;如果這些方案無法充分彌補損失,則按比例降低價格。

David
David

I’d want the opportunity to inspect disputed components before they’re discarded or altered. That protects both sides and may help us identify whether the issue arose in transit or during production.

我希望有機會在有爭議的零部件被丟棄或改動之前進行檢驗。這能保護雙方,也有助於確認問題是在運輸過程中還是生產過程中產生的。

Grace
Grace

Agreed. We’ll preserve the components for a reasonable period and provide access on notice. Mia will circulate a marked-up draft, and we can resolve any remaining wording before it’s signed.

同意。我們會在合理期限內保留這些零部件,並在收到通知後提供檢驗機會。Mia會發出一份修訂稿,我們可以在簽署前解決剩餘的措辭問題。

David
David

That sounds practical. Clear milestones, reporting rules, and remedies should prevent misunderstandings without making the agreement unnecessarily rigid. Send it over, and I’ll review it with our team.

聽起來很務實。明確的交付節點、報告規則和補救措施,應該能避免誤解,同時不會讓協議變得過於僵化。發給我吧,我會和團隊一起審閱。

詞彙7

  • leave too much room for different interpretations留下太多不同解釋的空間

    This means wording is unclear enough that people may understand it in different ways. Use it to explain why a policy or agreement needs more precise language.

    這表示措辭不夠明確,可能會讓人產生不同理解。你可以用這個表達說明為什麼政策或協議需要寫得更精確。

  • fixed dates明確日期

    These are specific, agreed-upon calendar dates rather than approximate deadlines. The phrase is useful when setting a clear schedule.

    指雙方約定的具體日期,而不是大致的截止時間。設定清晰的時間安排時,可以用這個表達。

  • outside our control我們無法控制的

    This describes events a person or organization cannot prevent or manage. Use it to qualify responsibility for delays or other problems.

    用來描述個人或組織無法預防或控制的事件。談到延誤或其他問題的責任時,可以用它來限定責任範圍。

  • latent defects隱蔽缺陷

    These are flaws that are not immediately visible and may only be found later. The term is commonly used in contracts, inspections, and product claims.

    指不容易立即發現、可能要過一段時間才能查出的瑕疵。這個術語常用於合同、檢驗和產品索賠。

  • clear outer limit明確的最長期限

    This means a firm final deadline or boundary. Use it when discussing how long someone has to make a claim or complete an action.

    指明確規定的最終截止時間或界限。討論提出索賠或完成某項行動的期限時,可以用這個表達。

  • proportionate price reduction按比例降低價格

    This is a price decrease that reflects the seriousness or extent of a problem. It is a formal way to describe compensation when repair or replacement is insufficient.

    指根據問題的嚴重程度或影響範圍相應降低價格。這是一種正式說法,用來描述維修或更換無法充分彌補損失時給予的補償。

  • marked-up draft修訂稿

    This is a draft showing proposed edits or revisions. The phrase is useful when sharing contract changes for review.

    指註明擬議修改內容的草稿。分享合同修改內容以供審閱時,可以用這個表達。

關鍵句8

  1. 1

    After settling the current claim, we reviewed the agreement and found several provisions that leave too much room for different interpretations.

    解決當前索賠後,我們重新審閱了協議,發現有幾條規定留下了太多不同解釋的空間。

    This sentence explains why a contract is being revised. Reuse the structure to describe a review and identify unclear provisions in another document.

    這句話說明了修訂合同的原因。你可以套用這個句式,描述自己審閱某份檔案並指出其中含糊不清的條款。

  2. 2

    I can agree to fixed dates, provided the schedule accounts for carrier disruptions outside our control.

    只要時間安排考慮到承運方造成的、我們無法控制的中斷,我可以接受明確日期。

    This makes agreement conditional on a practical safeguard. Use “I can agree to X, provided Y” to negotiate terms while stating a condition.

    這句話表示同意是有條件的,同時提出了實際的保障措施。談判時可以用 “I can agree to X, provided Y”(只要滿足Y,我可以接受X)來表達條件。

  3. 3

    Any extension should be limited to the actual delay caused by the disruption and documented in writing.

    任何延期都應僅限於該中斷實際造成的延誤,並以書面形式記錄。

    This sentence sets boundaries on an exception and requires a written record. Reuse it when clarifying how adjustments to a deadline should work.

    這句話為例外情況設定了界限,並要求留下書面記錄。你可以在說明如何調整截止期限時套用這個句式。

  4. 4

    For inspections, we propose ten business days after receipt to identify visible defects, and a separate period for latent defects that reasonably couldn’t be found during that initial review.

    關於檢驗,我們建議自收貨之日起有十個工作日用於發現可見缺陷;對於在初檢時合理情況下無法發現的隱蔽缺陷,則另設報告期限。

    This clearly distinguishes the inspection period for visible flaws from the process for hidden ones. The structure is useful when proposing timelines for different types of review or reporting.

    這句話清楚地區分了可見缺陷的檢驗期限和隱蔽缺陷的處理流程。提出不同型別的檢驗或報告期限時,可以參考這個句式。

  5. 5

    We’ll also specify what evidence a report must include.

    我們也會明確報告必須包含哪些證據。

    This is a concise way to explain how reporting requirements will be made clearer. Reuse “We’ll also specify what…” to introduce another detail that needs to be defined.

    這是簡潔說明如何明確報告要求的說法。你可以套用 “We’ll also specify what…”(我們也會明確……)來補充說明還需要界定的細節。

  6. 6

    The remedies should be equally specific: repair or replacement, expedited shipping where appropriate, or a proportionate price reduction if those options don’t adequately address the loss.

    補救措施也應同樣明確:維修或更換;適當情況下加急運輸;如果這些方案無法充分彌補損失,則按比例降低價格。

    This sentence lists possible remedies and explains when an alternative may be needed. Use the colon structure to introduce a precise set of options.

    這句話列出了可能的補救措施,並說明何時可能需要採用替代方案。可以用冒號引出一組具體選項。

  7. 7

    I’d want the opportunity to inspect disputed components before they’re discarded or altered.

    我希望有機會在有爭議的零部件被丟棄或改動之前進行檢驗。

    This politely states a procedural safeguard and explains when access is needed. Reuse “I’d want the opportunity to…” to request a chance to review something before action is taken.

    這句話禮貌地提出了一項程式保障,並說明了需要獲得檢驗機會的時間。你可以套用 “I’d want the opportunity to…”(我希望有機會……),請求在採取行動前檢查某樣東西。

  8. 8

    Clear milestones, reporting rules, and remedies should prevent misunderstandings without making the agreement unnecessarily rigid.

    明確的交付節點、報告規則和補救措施,應該能避免誤解,同時不會讓協議變得過於僵化。

    This balances the value of clarity with the need for flexibility. It is useful when summarizing how proposed rules can reduce disputes without creating excessive restrictions.

    這句話兼顧了明確規定的價值和保持靈活性的必要。總結擬議規則如何減少爭議、又不造成過多限制時,可以用這個表達。