Discussing an Unexpected Extra Cost

讨论意外增加的费用

Leo says hidden water damage will require extra work and a higher bill. Grace asks for an itemized estimate and explains that she cannot approve additional costs without understanding them first.

Leo表示,隐蔽的水渍损坏需要额外施工,因此费用会上涨。Grace要求提供逐项报价,并说明在弄清费用明细前,她不能批准额外支出。

对话10

Discussing an Unexpected Extra Cost
Leo
Leo

Grace, when we opened the bathroom wall, we found water damage behind the tiles. The affected framing needs replacing before we can finish the shower.

Grace,我们拆开浴室墙面时,发现瓷砖后面有水渍损坏。要完成淋浴间的施工,得先更换受影响的木框架。

Grace
Grace

I understand hidden damage can come up, but this is the first I’ve heard about it. Why wasn’t I contacted before the crew started additional work?

我明白施工中可能会发现隐蔽损坏,但这是我第一次听说这件事。施工队开始做额外工作之前,为什么没有联系我?

Leo
Leo

You’re right; we should have called. The crew was trying to keep things moving, and I didn’t realize they’d gone ahead with the removal before getting your approval.

你说得对,我们本该先打电话。施工队当时是想赶进度,我也没意识到他们还没得到你的批准就先拆除了损坏部分。

Grace
Grace

I appreciate the explanation, but I can’t approve a higher bill based on a rough estimate. Could you send me an itemized breakdown of the added labor and materials?

谢谢你解释情况,但我不能只凭一个大概估算就同意增加费用。你能把额外的人工和材料费用逐项列出来发给我吗?

Leo
Leo

Of course. Replacing the framing and treating the area will add about twelve hundred dollars, though I’ll confirm the exact amount after the supplier gets back to me.

当然。更换木框架并处理受损区域大约要增加一千二百美元,不过我会等供应商回复后确认准确金额。

Grace
Grace

Please include the supplier’s quote, the hours involved, and any change to the completion date. I’d also like photos of the damage for my records.

请附上供应商的报价、所需工时,以及完工日期是否会变动。我还想要损坏部位的照片,留作记录。

Leo
Leo

That’s fair. I can send the photos and a revised estimate by tomorrow afternoon. We may lose a day while the replacement materials are delivered.

这样很合理。我最迟明天下午可以把照片和修订后的报价发给你。等待替换材料送达期间,我们可能会耽误一天。

Grace
Grace

I can consider the added cost once I’ve reviewed the breakdown, but please don’t authorize any more extra work until I approve it in writing.

我看过费用明细后可以考虑这笔额外开支,但在我书面批准之前,请不要安排其他额外工程。

Leo
Leo

Understood. We’ll pause the repair beyond making the area safe, and I’ll mark the added work as pending approval on the estimate.

明白。除了确保现场安全之外,我们会暂停维修。我也会在报价单上把这部分额外工程标注为待批准。

Grace
Grace

Good. Once I have the itemized estimate and photos, I’ll get back to you promptly. Then we can agree on the cost and how it affects the schedule.

好。收到费用明细和照片后,我会尽快回复你。之后我们再商定费用,以及这会如何影响工期。

词汇6

  • hidden damage隐蔽损坏

    Damage that is concealed and cannot be seen until something is opened or removed. Here, it refers to water damage behind the bathroom tiles.

    指被遮挡、需要拆开或移除某些东西后才能发现的损坏。这里指浴室瓷砖后面的水渍损坏。

  • rough estimate粗略估价

    An approximate cost, rather than a final confirmed amount. You can ask for a detailed estimate before agreeing to pay.

    指大致的费用,而不是最终确认的金额。在同意付款前,你可以要求对方提供详细报价。

  • itemized breakdown逐项费用明细

    A list that shows the separate costs, such as labor and materials. It helps you understand exactly what you are being charged for.

    列出各项费用的清单,比如人工费和材料费。这样可以帮你准确了解收费项目。

  • for my records留作记录

    A phrase meaning you want to keep something as documentation. It is often used when requesting photos, receipts, or other evidence.

    这个短语表示你想把某样东西保存下来作为凭证。请求照片、收据或其他证明材料时,经常会用到。

  • in writing以书面形式

    Recorded in a written form, such as an email or signed document. It makes approval clear and creates a record of the decision.

    以书面形式记录下来,比如通过电子邮件或签署文件。这样可以明确批准事项,并留下决策记录。

  • pending approval待批准

    Waiting for someone to approve something before it can proceed. Here, the added work is not authorized yet.

    指某件事需要等人批准后才能继续。这里表示新增工程尚未获得授权。

重点句子7

  1. 1

    Why wasn’t I contacted before the crew started additional work?

    施工队开始做额外工作之前,为什么没有联系我?

    Use this to ask why you were not informed before someone took action. It raises a concern directly while keeping a professional tone.

    当你想询问为什么别人采取行动前没有通知你时,可以这样说。它能直接表达你的关切,同时保持专业的语气。

  2. 2

    Could you send me an itemized breakdown of the added labor and materials?

    你能把增加的人工和材料费用逐项列出来发给我吗?

    This is a polite way to request a detailed explanation of extra costs. You can adapt it by naming the charges you want listed.

    这是一种礼貌的说法,用来要求对方详细说明额外费用。你也可以根据需要,具体说出想列明的费用项目。

  3. 3

    Please include the supplier’s quote, the hours involved, and any change to the completion date.

    请附上供应商的报价、所需工时,以及完工日期是否会变动。

    Use this when you need specific details to evaluate a proposal. The list structure makes it clear what information you expect.

    需要具体信息来评估一项方案时,可以这样说。用清单的形式表达,能让对方清楚你需要哪些信息。

  4. 4

    I can consider the added cost once I’ve reviewed the breakdown, but please don’t authorize any more extra work until I approve it in writing.

    我看过费用明细后可以考虑这笔额外开支,但在我书面批准之前,请不要安排其他额外工程。

    This sentence sets a clear condition and boundary: you will review the cost, but additional work needs written approval first. It is useful in negotiations about expenses or changes to a project.

    这句话明确提出条件和界限:你会审核费用,但其他额外工程必须先得到书面批准。讨论费用或项目变更时,这种说法很实用。

  5. 5

    We may lose a day while the replacement materials are delivered.

    替换材料送达期间,我们可能会耽误一天。

    Use “may” to describe a possible consequence without presenting it as certain. You can reuse this structure to explain a potential delay or other impact.

    用“may”来说明可能出现的后果,而不是把它说成确定会发生。你可以套用这个句型,说明可能出现的延误或其他影响。

  6. 6

    Once I have the itemized estimate and photos, I’ll get back to you promptly.

    收到费用明细和照片后,我会尽快回复你。

    This explains what you need before responding and reassures the other person that you will reply quickly afterward. “Once” introduces the condition that must be met first.

    这句话说明你需要先拿到什么才能回复,也让对方知道你之后会尽快答复。“Once”引出必须先满足的条件。

  7. 7

    Then we can agree on the cost and how it affects the schedule.

    之后我们可以商定费用,以及这会如何影响工期。

    This suggests resolving both the price and timing together. It is a collaborative way to move a negotiation toward a decision.

    这句话建议把费用和时间安排一起谈妥,是一种合作式的表达,有助于推动协商并作出决定。