Reviewing the Contract With Legal

与法务审查合同

Grace consults Mia, the company’s legal adviser, about the delivery deadlines, inspection terms, and remedies set out in the contract. They clarify which claims are supported by the wording and what evidence they need before approaching the supplier.

Grace 向公司法律顾问 Mia 咨询合同中的交货期限、验收条款和补救措施。他们确认合同措辞支持哪些主张,以及联系供应商前还需要准备哪些证据。

对话12

Reviewing the Contract With Legal
Grace
Grace

Mia, before I contact the supplier, I want to be precise about what the contract actually entitles us to claim—not just what feels fair given the disruption.

Mia,在我联系供应商之前,我想准确弄清楚合同实际赋予我们哪些索赔权利,而不只是考虑这次影响让我们觉得怎样才算公平。

Mia
Mia

That’s sensible. The key provisions are the delivery schedule, the inspection and notice period, and the remedies clause. Let’s separate what the wording guarantees from what we may need to negotiate.

这样做很明智。关键条款包括交货时间表、检验与通知期限,以及补救措施条款。我们先区分合同明确保障的权利和可能需要协商的事项。

Grace
Grace

The order confirmation gives a delivery date, but the main agreement says delivery dates are estimates unless a milestone is expressly designated as binding. Is this date binding?

订单确认书上列了交货日期,但主协议规定,除非某个里程碑被明确标注为有约束力,否则交货日期都只是预估日期。这个日期具有约束力吗?

Mia
Mia

The schedule attached to the agreement labels this one a “firm delivery milestone.” That should support a breach claim, although we’ll need the signed schedule and records showing when the shipment arrived.

协议附件中的时间表将这一天标为“确定的交货里程碑”。这应当能支持违约主张,不过我们还需要已签署的时间表,以及证明货物实际到货时间的记录。

Grace
Grace

The shipment arrived four days late. We’ve logged the arrival, the production stoppage, and the overtime needed to reshuffle the schedule. Are those costs recoverable?

这批货晚到了四天。我们记录了到货时间、生产停工情况,以及为重新安排进度而产生的加班成本。这些费用可以索赔吗?

Mia
Mia

Potentially, if they were reasonably foreseeable and documented. The contract excludes indirect or consequential losses, so lost output may be disputed; direct, substantiated expenses are a stronger claim.

有可能,前提是这些损失可以合理预见,并且有证据支持。合同排除了间接或后果性损失,因此产量损失可能会引起争议;直接且有凭证的支出则更有依据。

Grace
Grace

Now the defects. The inspection clause gives us five business days after delivery to report visible defects, but it says latent defects must be reported promptly after discovery.

接下来是质量缺陷。检验条款规定,我们必须在交货后五个工作日内报告明显缺陷;对于潜在缺陷,则必须在发现后及时报告。

Mia
Mia

Then we should map each defect to its discovery date and notice. For anything visible, we need proof the report was sent within that five-day window—not merely an internal quality log.

那么,我们应当逐项记录每个缺陷的发现日期和通知情况。对于明显缺陷,我们需要证明报告在这五天期限内已经发出;仅有内部质检记录还不够。

Grace
Grace

Our quality team emailed a preliminary notice on day four and followed up with photographs the next morning. Does that preserve the claim, or could the supplier argue the notice lacked detail?

我们的质检团队在第四天发出了初步通知,第二天早上又补发了照片。这样是否足以保留索赔权利?供应商会不会辩称通知内容不够详细?

Mia
Mia

The clause requires notice identifying the nature of the defect, not a complete technical diagnosis. If that email described the failed components clearly, the later photographs should strengthen—not replace—the timely notice.

条款要求通知中指出缺陷的性质,并未要求提供完整的技术诊断。如果那封邮件清楚说明了哪些部件不合格,后续照片应当是补强及时通知的证据,而不是取代它。

Grace
Grace

What remedies can we assert without overstating our position? The agreement allows replacement or repair, but I don’t see an automatic right to a full refund or a price reduction.

我们可以主张哪些补救措施,才能避免夸大立场?协议允许更换或维修,但我没看到其中自动赋予我们全额退款或降价的权利。

Mia
Mia

Correct. We can request the contractual remedies and reserve any supported damages, while avoiding a definitive demand until we verify the notice trail, delivery records, and itemized costs.

没错。我们可以要求合同约定的补救措施,并保留有证据支持的损害赔偿主张;在核实通知记录、交货记录和逐项费用之前,先不要提出最终索赔金额。

词汇7

  • entitles us to claim赋予我们索赔的权利

    Means gives us the right to ask for something under the contract. Use it when checking what you are legally allowed to request.

    意思是根据合同,我们有权提出某项要求。核对法律上允许请求什么时,可以用这个表达。

  • expressly designated as binding明确指定为有约束力

    Means clearly identified as something the parties must follow. This phrase distinguishes a firm commitment from an estimate or general expectation.

    意思是清楚说明某项内容是双方必须遵守的。这个短语用来区分明确承诺与估算或一般预期。

  • foreseeable可预见的

    Describes a consequence that could reasonably have been anticipated. It is often used when discussing whether losses may be recoverable.

    形容可以合理预料到的后果。讨论损失是否可以获得赔偿时,经常会用到这个词。

  • latent defects潜在缺陷

    Means faults that are hidden and not readily visible during an initial inspection. Use this term when a problem becomes apparent only later.

    指隐藏起来、在初次检验时不容易发现的缺陷。问题后来才显现时,可以用这个术语。

  • preserve the claim保留索赔权利

    Means take steps to keep the right to make a claim. In this context, timely notice may help prevent the supplier from arguing that the claim was lost.

    意思是采取措施,确保自己仍有权提出索赔。在这里,及时通知有助于避免供应商辩称索赔权利已经丧失。

  • itemized costs逐项列明的费用

    Means expenses listed separately with details, rather than presented as one total. An itemized record can help substantiate a request for compensation.

    指分别列出并附有明细的各项费用,而不是只报一个总数。逐项列明的记录有助于证明赔偿请求有依据。

  • reserve any supported damages保留有依据的损害赔偿请求

    Means keep the option of seeking damages that the evidence and contract justify. It lets you avoid giving up a potential claim before the facts are verified.

    意思是保留索取有证据和合同依据的损害赔偿的权利。这样,在事实核实之前,就不必放弃可能成立的索赔。

重点句子6

  1. 1

    Let’s separate what the wording guarantees from what we may need to negotiate.

    我们先区分合同措辞明确保障的权利和可能需要协商的事项。

    This is a useful way to distinguish contractual rights from requests that may require agreement. Reuse it when setting realistic expectations before a negotiation.

    这是一种实用的说法,用来区分合同权利与可能需要双方达成一致的请求。在协商前设定合理预期时,可以借用这个句式。

  2. 2

    That should support a breach claim, although we’ll need the signed schedule and records showing when the shipment arrived.

    这应当能支持违约主张,不过我们还需要已签署的时间表,以及证明货物到货时间的记录。

    This sentence makes a qualified assessment and identifies the evidence needed to support it. Reuse the pattern “That should support..., although we’ll need...” when explaining both a position and its limits.

    这句话谨慎地评估了主张是否成立,并指出需要哪些证据来支持。解释立场及其局限时,可以借用句型“That should support..., although we’ll need...”。

  3. 3

    Potentially, if they were reasonably foreseeable and documented.

    有可能,前提是这些损失可以合理预见,并且有记录为证。

    This concise response shows that an answer depends on specific conditions. Reuse “Potentially, if...” to express a cautious possibility rather than a guarantee.

    这个简短的回答说明结论取决于具体条件。用“Potentially, if...”可以表达谨慎的可能性,而不是作出保证。

  4. 4

    For anything visible, we need proof the report was sent within that five-day window—not merely an internal quality log.

    对于任何明显缺陷,我们都需要证明报告是在五天期限内发出的,而不能只有内部质检记录。

    This sentence clarifies what kind of evidence is necessary and contrasts it with evidence that may not be enough. Reuse “not merely...” to emphasize an important distinction.

    这句话说明需要哪类证据,并将其与可能不足以证明情况的证据作对比。用“not merely...”可以强调重要区别。

  5. 5

    The clause requires notice identifying the nature of the defect, not a complete technical diagnosis.

    条款要求通知中指出缺陷的性质,而不是提供完整的技术诊断。

    This explains the actual standard in the contract without demanding more than the wording requires. Reuse “requires X, not Y” to correct an assumption precisely.

    这句话准确说明合同规定的标准,没有提出措辞中并未要求的额外条件。用“requires X, not Y”可以精准地纠正别人的假设。

  6. 6

    We can request the contractual remedies and reserve any supported damages, while avoiding a definitive demand until we verify the notice trail, delivery records, and itemized costs.

    我们可以要求合同约定的补救措施,并保留有依据的损害赔偿请求;但在核实通知记录、交货记录和逐项费用前,不要提出最终索赔金额。

    This sentence balances assertiveness with caution by stating what can be requested and what still needs verification. Reuse “while avoiding...” to describe a prudent limit on an action.

    这句话兼顾了积极主张和谨慎处理,既说明可以提出什么要求,也指出还有哪些事项需要核实。用“while avoiding...”可以说明采取行动时应保持的审慎限度。

喜欢使用 English Dialogue 吗?

在 Microsoft Store 中快速评价一下,可以帮助其他学习者找到这款应用。